Well, I don't know what's gotten into Dave. He thinks he's so busy and so he's trying to make me his secretary or something. He gives me all these things he wants me to type out on the computer and file this and file that and take pictures of this and take pictures of that. He's getting so carried away with this project that now he's talking about getting an iMac and an iPod Nano and iTunes and an iPhone, etc, etc. .... he just doesn't get it. When I type, my dexterity is a little off. I may be going for one specific letter on the key board but I end up pushing down four or five of them and I don't need a phone, my ears work pretty good. Dave's just got to take a pill and chill out ... because ... iDog ~ iChew, iDig, iBark, iRun, iEat, iSleep, iPlay, i (have)Paws and sometimes iDrag (my rearend across the carpet). Just telling you how it is Dave. I'll do the photo ops and promote this project, but the brass tacks of it ... iDog ~ uHuman.
BOB !

iDave ... weekend update 409

... well, thanks for setting me straight BOB. No wonder it took me an hour a word to figure out what you had typed. I thought I was reading one of those new direction manuals you get now a days when you buy something. Glad to know it's something as simple as you being iDog.

It's been business as usual here the past few weeks and if you visited the school for an event, Homecoming, conferences, etc. you got a first hand look at what's happening here.

I've posted several photos on this week's update. Starting from the most recent to the last, Over MEA we shut down the water and gas and made the final reconnections for the school year now. They also started to demo the lavatories across from the music area and they are suppose to be ready for the winter activities as will the new HS/MS office area.

You can now see the footings for the fieldhouse, which will give you an idea how much area our new addition covers. The new light poles for the parking lot will be installed mid-November and replace the tempory ones that Xcel installed on the west end of the lot.

Electrical conduit and roof beams and the replacement of the shop retention tank are among some other of the other construction items that are taking place. The roof for the new shop and receiving area will be installed the last week of October.

It's been a little cool in the High School because we have not been able to turn the boilers on yet. We'll be finishing up insulation, new vavles and make-up water tank in the next week, week and a half.

The new Alrenative Learning Center which is housed in the Community Center is just about completed. A little more paint and the hook-up of the computer system will be finished this week. The new sidewalk and steps were installed last week.

The photos you see of the holes in the tunnel underneath the old HS/MS offices are for footings that will hold columns for the new roof over the main entryway/lobby area of the auditorium.

Some of the hall ceilings have been removed to make way for the new domestic water lines, sprinkler system lines, computer lines, fire alarm lines and new suspended ceiling and lights. All ceilings throughout the building will get the same treatment.

The IMC at the Elementary was also remodeled this summer with new carpet, paint and bookshelves.

We are planning to replace the whole roof at the Elementary next summer and I've included some photos of the hail damage we received on the copper roofs this summer.

Our 10,000 gallon fuel oil tank was removed this summer and will be replaced with a 4,000 gallon tank. We will maintain duel fuel capacity for the building and there will also be a generator installed that will automatically switch over when needed to keep our building up and running for the regular day and/or an emergency situation that the community would need to facilatate the building.

It's been going well and I can't say enough about Met-Con Construction, their workers and different trades and especially Ken Gergen, the project manager on site. Thanks !

iDave

New Field House Footings - se corner and south footings




Main Entryway footing & Boys Lav across from Music area




New Electrical Conduit coming to the Boiler Room




Auditorium Columns & old/new retention tanks (CPO 3PO)




Shop & Receiving Area roof beams (project manager Ken Gergen in red cap)




Alternative Learning Center classroom before & after




Alternative Learning Center sidewalk & steps




Tunnel Openings for New roof beam columns




Tunnel Footing Opening & Main Entryway Pipe




Senior Wing & Middle Hallway ceilings removed




Elementary IMC remodel / Hail damage - Elem. Roof




Hail Damage - Elementary copper roof




Fuel Oil Tank / Roots around the Conduit




Friday, October 3, 2008

Night time is the right time ....... for SLEEP

Bob says - 'when night falls, I myself like to climb up on a comfortable couch and get in a good night's sleep, not work out in the middle of the road down in a hole installing a new pressure relief valve until 10:30 for the High School's water, but I'm glad we have dedicated workers doing that for us - Thanks guys you did a great job! ... Sweet Dreams'

Wednesday night, installing new pressure relief valve




Pressure relief valve in street / valve removed




Elevator shaft for auditorium / new gas lines